Monday, October 19, 2015

Bathroom Tile

The tile sub-contractor Joe hired did a great (and quick!) job tiling the bathroom. We were able to use tile leftover from the last bathroom remodel we did in the big house. These shots are pre-grout, I will update the post later this week with the finished tile.



No comments:

Post a Comment