This past weekend we had a landscaping crew remove 16 yards (!) of soil, recycle the concrete from the shed foundation we demolished, grade the southern half of the lot, and put over 6 yards of 5/8 gravel in place for the parking requirement. They got it all done in a day!!
Loading up the concrete chunks so they can be taken to Dirt Exchange for recycling |
The dry well before it was covered, which will receive all of the run off from the overflow of the rain barrels |
The Bobcat getting to work after the site was cleared |
Looks better all ready! |
It was raining pretty vigorously all day so the soil got pretty mucky |
Grading almost complete |
The first load of gravel arrives |
Smoothing out the gravel and covering the giant patches of mud created by the Bobcat and the landscapers' truck |
The finished parking pad |
Parking pad as seen from the alley |
Parking pad with the cottage. Nearly finished! |