Friday was the Big Pour--the cottage foundation is a 24" thickened slab. This equates to 12.5 cubic yards of concrete, nearly two full trucks worth! Joe found a great crew of finishers and they did a fantastic job making the slab level and super-duper smooth. With the exception of the bathroom, the floor of the cottage will be the slab itself, so it was important to have a high quality finishing job, and they totally nailed it.
The framing package arrives on Tuesday, and then the cottage will really start to take shape.
| All the forms in place, just waiting for the truck |
| Halfway through leveling |
| Finishing the pour |
| The silky-smooth surface of the finished foundation |
No comments:
Post a Comment